| Brand Name: | ThoYu |
| Model Number: | TY-1250 |
| MOQ: | 1 set |
| Price: | Negotiation |
| Delivery Time: | 20-50 working days |
| Payment Terms: | L/C, D/A, D/P, T/T |
Fully Automatic Waste Plastic Recycling Processing Plant
Introduction of Fully Automatic Waste Plastic Recycling Processing Plant:
Fully Automatic Waste Plastic Recycling Processing Plant is designed to produce various moulding pallet, and is also called plastic pallet making machine, plastic pallet molding machine, pallet making machine, and so on.
Fully Automatic Waste Plastic Recycling Processing Plant is the new type of plastic pallet machine with high pressure.
Fully Automatic Waste Plastic Recycling Processing Plant meets the requirement of environmental protection, and can help recycle waste plastic to get profits.
![]()
![]()
![]()
![]()
Technical Parameters of Fully Automatic Waste Plastic Recycling Processing Plant:
| Model | TY-1250 |
| Voltage | 220 V/380 V, 50 Hz, three-phase |
| Capacity | 180 pallets/day (24 hours) |
| Power | 75kW |
| Hydraulic cylinder diameter | 350 mm |
| Hydraulic cylinder quantity | 4 pieces |
| Pressure | 1250 t (adjustable) |
| Shaping cycle | 300 seconds |
| Weight | 33tons |
| Dimension | 4200*2200*3500 mm |
| Remarks: it includes one set of normal moulds along with one set machine. | |
![]()
![]()
![]()
![]()
Our advantages
1. High degree of automation
There is no manual operation in the process, which realizes the automatic control with long-term, stable, effective. It also makes pallet making process more stable, and realizes fine work of production.
2. Good final pallet
The quality of final plastic pallets is as good as the traditional ones. Meanwhile, the final pallets are one-piece design, which are saving space 60% than the traditional ones.
3. Advanced technology
We update the traditional pallet making machine and independently produce the plastic pallet making machine. This production line adopts new technology to reduce the cost of raw materials.
FAQ:
Q: Can you send me the video to show how the machine works?
A: Certainly, we have made videos of every machine and uploaded them to Youtube.
Q: What is the delivery time?
A: About 7- 45 working days after the contract signing (After getting deposit). Delivery time will vary depending on the type of machine, shipping method selected, and part availability.
Q: How long is the warranty of your equipment? Do you supply spare parts?
A: Our warranty period is one year generally. We can supply spare parts.
Q: Do you provide equipment operation training?
A: Yes. Our technicians are available to guide the installation, adjustment, commissioning, and operation training of the machines on the working site.